TankQ

FRP After-Sales Services

Full lifecycle FRP tank care - inspection, repair, coating, and upgrades

FRP Tank Inspection

Visual QC, wall thickness, Barcol hardness, structural check with Inspection Report.

  • Wall Thickness Measurement
  • Barcol Hardness Test
  • Visual Crack / Blister Check

FRP Tank Repair

Repair cracks, blisters, reinforce thin spots, relamination with same or upgraded resin.

  • Crack Repair
  • Blister Repair
  • Structural Reinforcement

FRP Lining Application

Apply FRP Vinyl Ester lining inside tanks to protect from chemicals. Upgrade steel or concrete tanks.

  • Steel Tank
  • Concrete Tank
  • Vinyl Ester / Isophthalic Lining

Accessory Replacement

Replace worn nozzles, manholes, gaskets, valves, ladders, level gauges.

  • FRP / PP / SS Nozzle
  • Manhole & Cover
  • Level Gauge & Valve

On-site Survey

Engineer surveys site, assesses space, designs system, proposes layout plan.

  • Free Consultation
  • Site Measurement
  • Layout & Piping Plan

Annual PM Contract

Annual FRP tank maintenance contract. 2 inspections/year with report and advance repair plan.

  • 2 inspections/year
  • Inspection Report
  • 15% repair discount